Project Year: 2012
Client:
TUPRAS (Turkish Petroleum Refineries Co. Inc.) Project Investments Directorate

 

SCOPE

On 55 Concrete Foundations Along The Coastline;

450 Tons Steel Pipe Bridge Fabrication, Erection, Project Design and Construction Works

68.000 WDI (Dia-inches) Steel Piping Fabrication and Erection

95.000 WDI (Dia-inches) HDPE Piping Material Supply, Fabrication and Erection

112.000 m3 Excavation, BackFilling and Concrete Works

 

NUMBER OF EMPLOYEES

125 Staff / Month

Total: 1.094.000 Man-Hour Working (48 Months)