Project Year: 2013
Client:
TUPRAS (Turkish Petroleum Refineries Co. Inc.) - Project Investments Directorate

 

SCOPE

35 Meters Bridge on 16 Bored Pile Foundations;

110 Tons Steel Pipe Bridge Fabrication and Erection Works

34.000 WDI (Dia-inches) Piping Fabrication and Erection

9.000 m3 Excavation, BackFilling and Concrete Works

 

NUMBER OF EMPLOYEES

95 Staff / Month

Total: 141.200 Man-Hour Working (4 Months)