Project Year:
2013
Client:
TUPRAS (Turkish Petroleum Refineries Co. Inc.) - Project Investments Directorate
Client:
TUPRAS (Turkish Petroleum Refineries Co. Inc.) - Project Investments Directorate
SCOPE
35 Meters Bridge on 16 Bored Pile Foundations;
110 Tons Steel Pipe Bridge Fabrication and Erection Works
34.000 WDI (Dia-inches) Piping Fabrication and Erection
9.000 m3 Excavation, BackFilling and Concrete Works
NUMBER OF EMPLOYEES
95 Staff / Month
Total: 141.200 Man-Hour Working (4 Months)
Ercan Celik